PVC Cure Completion Time
Calculate the clock time when a PVC solvent-weld joint reaches full cure. Enter the bonding finish time and the manufacturer's recommended dwell duration to know when pressurisation or backfilling is safe.
Follow all safety data sheets and local plumbing codes. This planner does not replace manufacturer or inspector requirements.
Examples
- Started at 09:30 with a 12-hour cure ⇒ ready at 21:30 the same day.
 - Started at 15:45 with 18 h 30 min cure ⇒ ready at 10:15 the following day.
 - Started at 22:10 with 8-hour cure ⇒ ready at 06:10 the next morning.
 
FAQ
Does the calculator adjust for temperature automatically?
No. Enter the correct cure duration for your temperature range. Many manufacturers provide tables by °F/°C and pipe size.
What if the cure time spans multiple days?
The tool wraps times every 24 hours. Add 24-hour blocks manually if your specification exceeds one day to keep a project log.
Can I start pressurizing early?
Only if the manufacturer explicitly allows it. Most require full cure before pressure testing, especially for potable water lines.
How accurate is the time rounding?
Minutes are rounded to the nearest whole minute after combining hours and minutes, ensuring the schedule stays aligned with typical site clocks.
Additional Information
- Always reference the solvent cement label: cure time varies with pipe diameter, temperature, and humidity.
 - Cold weather (below 40 °F / 4 °C) or large diameter pipe often requires doubling the stated cure time.
 - Before pressure testing, verify joints visually and allow extra buffer time if the system carries critical loads.
 - For high-pressure or industrial applications, consult ASTM D2855 and manufacturer technical bulletins.